Performance Results

Refining Capacities in Russia

Novokuibyshevsk Refinery

Новокуйбышевский
Petroleum Product and Petrochemical Output, kt
Refinery throughput
7.9 mmt
Refining depth
74.2 %

Investments over the year were aimed at maintaining the existing facilities, building a hydrocracking and hydrotreating complex with off-site facilities, implementing operational efficiency projects, and designing other investment projects for the facility upgrade.

In 2019, the refinery commissioned its kerosene preparation unit.

Kuibyshev Refinery

Куйбышевский
Petroleum Product and Petrochemical Output, kt
Refinery throughput
5.1 mmt
Refining depth
66.1 %

In 2019, investments were focused on further construction of a vacuum gasoil hydrotreating unit, hydrogen and sulphur production units, off-site facilities, and FCC unit, as well as maintenance and operational efficiency projects.

Three monitoring stations were commissioned in order to assess the environment on a 24-hour basis. The new equipment is part of the industrial environmental monitoring system.

Syzran Refinery

Сызранский
Petroleum Product and Petrochemical Output, kt
Refinery throughput
6.1 mmt
Refining depth
78.0 %

As part of the upgrade programme, a 35 kV central distribution station was put into operation to receive, convert and distribute electricity for processing facilities covered by the programme.

The debottlenecking projects in 2019 included the replacement of the fractionation trays for the K- 10 vacuum column of the crude oil distillation unit as part of the project to increase the vacuum gasoil extraction at ELOU-AVT-6 unit.

Ryazan Refinery

Рязанская
Petroleum Product and Petrochemical Output, kt
Refinery throughput
15.8 mmt
Refining depth
72.4 %

The refinery launched commercial production of AI-95-K5 Euro-6 motor gasoline with improved environmental and operational properties compliant with STO 44905015-006-2017.

Investments over the year were aimed at maintaining the existing facilities, implementing operational efficiency projects, and designing investment projects for the facility upgrade.

The construction of a single laboratory building was completed, followed by the commissioning of a new high-tech laboratory, and 19/5, GFU, L-35/6-300, L-35/5-300, L-24/6 process units were transitioned to cutting-edge microprocessor-based distributed control systems (DCS).

Saratov Refinery

Саратовский
Petroleum Product and Petrochemical Output, kt
Refinery throughput
5.6 mmt
Refining depth
81.8 %

In 2019, the refinery focused on the maintenance of existing facilities, operational efficiency improvements, highly efficient debottlenecking projects related to facility configuration, as well as projects to hone the refinery’s long-term competitive edge.

Tuapse Refinery

Туапсинский
Petroleum Product and Petrochemical Output, kt
Refinery throughput
9.0 mmt
Refining depth
66.1 %

In 2019, investments were focused on the large-scale renovation projects, including the construction of a hydrocracking and hydrotreating complex with off-site facilities. Other implemented projects included the maintenance of the existing facilities and operational efficiency improvement.

The Tuapse Refinery completed the construction of water disposal (treatment) facilities and a jet fuel filtration unit as part of its diesel pool project.

Achinsk Refinery

Ачинский
Petroleum Product and Petrochemical Output, kt
Refinery throughput
6.3 mmt
Refining depth
68.7 %

In the reporting year, investments were focused on the comprehensive upgrade programme, including the construction of a hydrocracking complex with off-site facilities and a petroleum coke production unit, as well as on operational efficiency improvement and the maintenance of the existing facilities, including the restoration of a gas fractionation section of LK-6 Us unit.

Angarsk Petrochemical Company

Ангарская
Petroleum Product and Petrochemical Output, kt
Refinery throughput
8.9 mmt
Refining depth
80.5 %

In 2019, investments were focused on the comprehensive upgrade programme, including the construction of sulphuric acid alkylation units and diesel fuel hydrotreater with off-site facilities, as well as on operational efficiency improvement and the maintenance of the existing facilities.

Komsomolsk Refinery

Комсомольский
Petroleum Product and Petrochemical Output, kt
Refinery throughput
7.2 mmt
Refining depth
75.9 %

In 2019, investments were focused on the comprehensive upgrade programme, including the construction of a hydrocracking and hydrotreating complex with off-site facilities, as well as on operational efficiency improvement and the maintenance of the existing facilities.

The Komsomolsk Refinery was connected to the ESPO pipeline.

Bashneft refining complex: Bashneft-Novoil, Bashneft-Ufaneftekhim, and Bashneft-UNPZ

Нефтеперерабатывающий комплекс
In 2019, the throughput stood at
18.7 mmt
Refining depth
81.0 %

In 2019, investments were largely focused on maintenance of existing capacities, aligning rules and regulations with the relevant requirements, and implementation of the comprehensive upgrade programme.

Small refining facilities

Мини-НПЗ
In 2019, the throughput amounted to
1.9 mmt

The company holds interests in several small refining facilities in Russia (Nizhnevartovsk Refinery, Krasnoleninsky Refinery, Purneftepererabotka and Strezhevskoy Refinery 50%). In 2019, these facilities processed a total of 1.9 mmt of oil, 1.5 mmt of which was processed at the Nizhnevartovsk Oil Refining Association.

Novokuibyshevsk Oils and Additives Plant

Новокуйбышевский завод In 2019, the throughput amounted to
1.2 mmt
Marketable product output
0.5 mmt

In 2019, the facility continued to implement the programme on high-quality oil production for the hydrogenation complex under construction (Phase 1 and 2), as well as proceeded with its environmental, infrastructure and maintenance initiatives.